Primavera · MS Office Suite · MS Project · SharePoint

Ranish
K.T.

Planning & Controls Leader

Planning & Controls Leader with 30+ years of experience in multinational LNG and petrochemical organizations. Managed 100+ concurrent projects valued over US$1B, achieving 90%+ on-time and on-budget delivery.

9+

Roles

8+

Skills

Ranish K.T.
01

Experience

Senior Planning Engineer / Planning Specialist

QatarEnergy LNG (formerly Qatargas / RasGas)May 2007 - Present
  • Direct a brownfield portfolio of 100+ projects, each ranging from US$10M to US$300M, across initiation, FEED, and EPC phases, ensuring alignment with LNG business objectives.
  • Lead project planning and controls teams to govern a distributed portfolio executed by 10+ FEED contractors and 10+ EPC contractors, enforcing standardized project controls frameworks and execution methodologies.
  • Approve and assure contractor planning deliverables, including planning packages, baseline schedules, schedule basis, methodologies, level 5 hourly plans, schedule risk assessments, impact of variations, and claim resolutions.

Project Planning and Controls

QatarEnergy LNG (formerly Qatargas / RasGas)2014 - Present
  • Develop and optimize schedules, resource-loaded plans, and integrated shutdown/outage strategies to maximize resource efficiency, minimize outage duration, and protect critical production windows.
  • Conduct in-depth schedule and progress analyses, diagnose bottlenecks and slippages, identify critical paths and trends, forecast and track earned value EVM, and recommend delay mitigation and recovery strategies to PMT
  • Drive readiness reviews for major milestones, contribute to technical tender evaluations, rank contractors, and support periodic performance reviews and contract governance.

Asset Planning

QatarEnergy LNG (formerly Qatargas / RasGas)2007 - 2014
  • Championed and designed Integrated Activities Planning (IAP), a pioneering portfolio/project/activity integration framework for manufacturing assets, significantly improving visibility of shutdowns, projects, and routine activities.
  • Stewarded CAPEX/OPEX planning cycles, monitored cost overruns, and aligned asset-level plans with corporate strategy using SWOT analysis and structured business planning.
  • Tracked objectives, KPIs, budgets, flagged underperforming areas, implemented remedial actions

Specialized Mandates

QatarEnergy LNG (formerly Qatargas / RasGas)2007 - Present
  • Major Underwater pipeline failure investigation.
  • Primavera admin for 100+ users till 2017, design and maintain enterprise structure and data. Train P6 users.
  • Played a key role in enhancement initiatives integrating Primavera.

Lead Planning Engineer

TRAGS LTDJul 1998 - Apr 2006
  • Delivered project controls, contract execution, and planning for projects across major petrochemical and industrial clients, including QatarEnergy, QatarEnergy LNG, QAPCO, Qatar Steel, Ooredoo, and a US Army base.
  • Exercised end-to-end contract and project control from tendering through close-out
  • Spearheaded planning, monitoring, and control activities, allocating resources and tracking costs for multiple concurrent initiatives.

Planning Manager

TRAGS LTD2002 - 2004
  • Planning Manager – EPIC of piping, telemetry, and electrical works across 12 WHJ offshore platforms.
  • Lead Planning / Cost Engineer – portfolio of projects worth over US$50M, including pigging, purging, and overhaul works, vessel and tank rehabilitation, new large bore pipeline at Halul Island; ABB cooling water piping; US Army construction projects; Qatar Telecommunications works; space-frame structures, etc.

Senior Project Controls Engineer

TRAGS LTD2003 - 2006
  • Senior Project Controls Engineer – EPIC pipeline between QP Refinery and QVC; SRU stack dismantling, fabrication and erection; Khalifa Stadium civil construction, etc.
  • Lead Planning Engineer – more than 15 major shutdowns worth over US$35M, including Offshore PS2/PS3, seawater replacement projects at RasGas, and multiple shutdowns at QP/Qatargas

Project Coordinator

Vijay Fire Protection Systems LtdNov 1997 - Jul 1998
  • Coordinated fire protection projects for major petrochemical and power clients, including Gas Authority of India Ltd (Patta project).
  • Planned and monitored schedules and costs for fire protection systems (hydrant networks, medium/high velocity spray, sprinkler, dry chemical powder, and foam systems) across petrochemical facilities.

Project Engineer

Mukand LtdAug 1993 - Jun 1997
  • Executed project engineering, costing, planning, commissioning, and post-commissioning preventive maintenance for industrial projects within a US$400M engineering and steel group.
  • Managed pickling plant project, coordinating suppliers, vendors, and design/construction contractors, and issuing MIS reports on schedule, variance, and cost performance; scope included SS and lined piping, ETP, tanks, pumps, clarifiers, agitators, aerators, and hot water generators.
02

Skills

Primavera
MS Office Suite
MS Project
SharePoint
Power BI
AI Generalist 2025
SAP MM Siemens 2006
Piping Engineering IIT 1995
03

Education

NIT Calicut, India

B.S.E (B-Tech) Mechanical Engineering

May 1993 - May 1993

Résumé